PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing copper piping at the 2nd floor bathroom Facing East.jpg Installing exterior framing at the 2nd floor Facing North.jpg Installing motorized damper controllers at the 3rd floor Facing North-West.jpg Copper piping going up through the 3rd floor Facing North.jpg Installed weather strips at the curtain wall mullions South Elevation.jpg
Previous page Installed weather strips at the curtain wall mullions South Elevation
Installed weather strips at the curtain wall mullions South Elevation